Temporary Stairway
Product Highlights
- Rapid install – Safer, faster alternative to scaffolding.
- Flexible use – Fits multiple step and width options.
- Crane-lift ready – Built for quick relocation and reuse on active sites.
SKU WO79002z
Quickest Available Delivery: Quickest Available Delivery: 5 Day Delivery
HERMEQ’s Temporary Stairway is a versatile solution for temporary access in construction environments, offering a safer and faster alternative to scaffolding. Designed for user assembly, no special license is required—simply follow the included operation manual for safe setup. Its modular system supports 3 to 18 steps in a single flight, adapting easily to multi-story projects, uneven terrain, or phased builds.
Key Features:
- Fast assembly – Quick setup reduces downtime compared to scaffolding.
- Adjustable pitch – Can be set between 0° and 50° to suit different site conditions.
- Non-slip steps – Provide reliable footing in all weather.
- Modular flexibility – Configurable from 3 to 18 steps, with widths of 27.5 in.
- Crane-lift ready – Built-in hooks and lifting handles for safe repositioning.
- Foldable storage – Collapses compactly for transport or site storage.
- Compliance assured – Fully compliant with applicable safety standards, supporting safer access on all types of jobsites.
This stairway is widely used across commercial, residential, and infrastructure projects to provide quick access between slabs, mezzanine levels, or temporary structures. Its folding design saves storage space, while crane hooks and lifting handles simplify relocation during active projects. Anti-folding locks ensure safe, stable performance, even in wet or challenging site conditions.
Uses & Applications
This heavy-duty temporary stairway is engineered for rapid deployment across a wide range of construction sites. Its standout feature is a modular, folding design that balances flexibility with structural integrity—ideal for projects that require frequent relocation of access points. Whether used to navigate newly poured slabs or for temporary access to mezzanine levels, this stair system addresses a critical need for safe vertical movement. One of the core pain points on fast-moving construction sites is the delay caused by scaffolding erection, particularly when teams only require stair access. With the Temporary Stairway, crews can bypass this bottleneck. Its quick-assembly design enables setup within minutes, dramatically reducing downtime. This is especially useful in interior finishing work, steel frame erection, or timber builds, where regular repositioning of stairs is essential. Anti-slip steps and anti-folding security locks address health and safety concerns, ensuring stable footing in varying weather conditions. The stairway’s folding construction makes it easy to store between projects, while integrated crane hooks allow safe repositioning with minimal manpower. Designed with portability in mind, the addition of lifting handles further simplifies on-site handling. Versatility is another major strength. From renovation projects requiring secure access between scaffolds and building structures, to new builds needing reliable multi-level navigation, this solution is both scalable and dependable. It supports compliance with applicable safety standards, giving buyers confidence that risk management requirements are met.
Applications extend beyond commercial building construction. Civil engineering teams and infrastructure contractors can use this stair system during bridgework, rail station upgrades, or utility maintenance where temporary yet secure access is critical. Unlike ladders or basic scaffold stairs, this stairway provides a much safer and more ergonomic access point, significantly reducing trip and fall risks. For projects where circular access is more suitable, the Temporary Spiral Staircase offers an ideal alternative. When used together, these products provide a complete access solution across a wide range of project scenarios.
Â
The Temporary Stairway is ideal for short-term access needs in construction where time and space are limited. With modular step options, adjustable pitch, and easy relocation features, it suits interior fit-outs, phased developments, or temporary mezzanine access.
HERMEQ stocks a wide range of equipment for Working at Height, including Edge Protection Systems, Fall Arrest Systems, and Harnesses & Lanyards conforming to all required US safety specifications and regulations.
Â
Need any help? Contact HERMEQ Today.
Contact our team via email sales@hermeq-usa.com or use our live chat feature between 8:00am & 17:00pm for help discovering our range.
| Number of steps | 3 | 6 | 9 | 12 | 15 | 18 |
| Width (in) | 27.6 / 39.4 | 27.6 / 39.4 | 27.6 / 39.4 | 27.6 / 39.4 | 27.6 / 39.4 | 27.6 / 39.4 |
| Height (ft) | 0 - 2.0 | 0 - 3.9 | 0 - 5.9 | 0 - 7.9 | 5.2 - 9.8 | 6.9 - 11.8 |
| Weight (lb) | 104 / 123 | 163 / 205 | 231 / 295 | 293 / 377 | 357 / 459 | 423 / 547 |
| Flight length (ft) | 2.6 | 5.3 | 7.3 | 10.6 | 13.3 | 15.9 |
| Length of stairs with feet (ft) | 4.6 | 7.2 | 9.8 | 12.5 | 15.1 | 17.7 |
| Max number of users on the stairs | 1 | 1 | 2 | 2 | 2 | 3 |
Do I need a license to install the Temporary Stairway?
No. The stairway is designed for user assembly and does not require a specialist license. It must be installed according to the included operation and maintenance documentation.
Â
How is the stairway transported?
It includes integrated lifting handles and can also be lifted by crane, making relocation between phases or zones quick and safe.
Â
Can the stairs be used in wet weather?
Yes. The steps feature a non-slip surface and the structure is stable under varying weather conditions. However, standard safety precautions must always be followed.
Â
Is it suitable for indoor and outdoor use?
Absolutely. The modular and foldable design makes it adaptable for both interior and exterior applications on a wide variety of jobsites.
Â
How much weight can it support?
The stair system is built to meet applicable safety standards, which includes load-bearing criteria typical for construction access. Always check documentation for project-specific limits.






































































